Production Readiness
DFM, DFT & Documentation
We bridge the gap between design and manufacturing. Our DFM analysis, test planning, and documentation services ensure your PCB designs are production-ready, testable, and fully documented for long-term success.
What We Deliver
DFM Analysis
Comprehensive Design for Manufacturing review covering trace widths, clearances, via sizes, solder mask, and panelization for optimal yield.
DFT Planning
Design for Test strategies including test point placement, boundary scan support, ICT fixture compatibility, and functional test access.
Fabrication Specs
Detailed fabrication notes, stackup specifications, material requirements, and surface finish specifications for PCB manufacturers.
Assembly Documentation
Pick-and-place files, assembly drawings, stencil specifications, and component orientation guides for SMT assembly lines.
Technical Manuals
Comprehensive technical documentation including design rationale, interface descriptions, test procedures, and maintenance guides.
Risk Assessment
FMEA-based risk analysis identifying potential manufacturing and reliability issues before production commitment.
Our Process
Design Audit
Review the PCB layout against manufacturing capabilities, identifying potential issues with tolerances, materials, and processes.
DFM Optimization
Recommend and implement design changes to improve manufacturability, reduce costs, and increase production yield.
Test Strategy
Define the test approach including test point placement, coverage targets, and fixture requirements for ICT and functional test.
Documentation Package
Create comprehensive documentation including fabrication drawings, assembly instructions, and quality acceptance criteria.
Production Support
Provide ongoing support during prototype and production builds, resolving manufacturing questions and optimizing processes.
Capabilities
Ready to start your project?
Get in touch with our team to discuss your requirements and receive a detailed quote.
Contact Us