Hardware–Software Co-Design

Firmware Integration

Great hardware deserves firmware that works on first boot. We bridge the gap between PCB design and software, delivering board bring-up, BSP development, and driver code that lets your team focus on application logic.

What does firmware integration cover?

Circuit Board Design handles board bring-up, BSP development, peripheral drivers and RTOS porting (FreeRTOS, Zephyr, ThreadX or bare-metal) on STM32, NXP i.MX RT and LPC, Nordic nRF52/nRF53/nRF91, ESP32 and other ARM Cortex-M and RISC-V parts. You receive commented source code, build files, a HAL API reference and a bring-up checklist, and IP ownership transfers to you on completion.

What We Deliver

Board Bring-Up

Systematic power sequencing validation, clock tree verification, and peripheral enumeration on first silicon to confirm the hardware design is correct.

BSP & Driver Development

Board Support Package development including GPIO, SPI, I2C, UART, USB, Ethernet, and custom-peripheral drivers for bare-metal and RTOS environments.

RTOS Porting

FreeRTOS, Zephyr, and ThreadX porting and configuration optimised for your MCU's memory map, interrupt priorities, and peripheral assignments.

Co-Design Consulting

Early-stage hardware review with firmware constraints in mind — pin assignment, boot mode strapping, debug port placement, and memory addressing.

Communication Stacks

Integration of Bluetooth, Wi-Fi, LoRaWAN, CAN, Modbus, and Ethernet stacks with the hardware abstraction layer of your chosen RTOS or framework.

Production Programming

Flash programming infrastructure: JTAG/SWD scripts, factory test firmware, bootloader development, and over-the-air (OTA) update mechanisms.

Our Process

1

Hardware & Firmware Scope Review

We review your schematic, target MCU/SoC, and software requirements to define the bring-up sequence and firmware deliverables.

2

Co-Design Feedback

Before layout is final, we flag any pin assignments, pull-up values, or boot strapping that would complicate firmware bring-up.

3

Board Bring-Up

Power-on, clock, and peripheral validation using a systematic checklist. Issues are traced to root cause (hardware or firmware) and resolved.

4

Driver & BSP Development

Peripheral drivers and HAL code written, reviewed, and tested against the actual hardware. Delivered with unit tests where applicable.

5

Integration & Handoff

Final integration with your application firmware. Documented HAL API, build system setup, and knowledge-transfer session for your team.

Capabilities

STM32 / NXP / Nordic / ESP32 platforms
FreeRTOS, Zephyr, ThreadX
SPI, I2C, UART, USB, CAN, Ethernet
Bluetooth LE & Wi-Fi stacks
LoRaWAN & Cellular (LTE-M / NB-IoT)
JTAG / SWD debug and programming
OTA firmware update frameworks
Bootloader development
Factory test firmware
Low-power sleep mode optimisation
Secure boot and firmware signing
Hardware-in-the-loop (HIL) test support

Frequently Asked Questions

What MCU and SoC platforms do you support?
We work primarily with STM32 (all series), NXP i.MX RT and LPC families, Nordic Semiconductor (nRF52/nRF53/nRF91), and Espressif ESP32. We can also support other ARM Cortex-M and RISC-V platforms — contact us with your target device.
Can you help with RTOS selection and porting?
Yes. We advise on RTOS selection (FreeRTOS, Zephyr, ThreadX, or bare-metal) based on your real-time requirements, memory constraints, and connectivity stack. We handle the full port including memory map configuration, interrupt routing, and peripheral clock setup.
Do you provide source code and documentation with the delivery?
Yes. All firmware deliverables include full commented source code, build system files (CMake or Make), a documented HAL API reference, and a bring-up checklist. IP ownership transfers to you on project completion.
Can you work alongside our existing firmware team?
Absolutely. We often engage as a specialist embedded layer — delivering the BSP and low-level drivers while your team owns the application. We use Git-based collaboration and can integrate into your existing CI/CD workflow.

Free quick check

Free quick check of your board: notes in 2 business days. Then a fixed quote.

Send a link to your schematic and layout. An IPC CID+ certified designer checks it against the faults that most often cost a respin, and you get written notes. No obligation.

Ready to start your project?

Get in touch with our team to discuss your requirements and receive a detailed quote.

Contact Us

Related reading