About Circuit Board Design
Enterprise-grade schematic capture and PCB layout, built for manufacturing handoff and predictable delivery.
Circuit Board Design — an Electuni LLC brand.

Niloy Mondal
CEO & Lead Hardware Engineer
I lead Circuit Board Design with a focus on schematic capture, high-reliability PCB layout, and manufacturing-ready documentation for production electronics.
I hold a Bachelor's in Electronic Engineering and a Master's in Computer Engineering, and I'm IPC CID and CID+ certified.
My approach is constraint-driven and DFM-first—built to reduce risk, shorten iteration cycles, and deliver clean handoff packages.
Services Provided Since
Delivery Team Model
Projects are founder-led for technical accountability, with scalable support added behind the scenes when schedule or complexity demands it.
Founder-led Accountability
You work directly with the founder as technical lead and final reviewer.
Scalable Support Bench
Additional engineering capacity is engaged as needed for layout execution, documentation, and bring-up support—without changing your point of contact.
On-Demand SME Network
We maintain a trusted network of subject matter experts that can be engaged for SI/PI review, RF, firmware integration support, and test strategy when beneficial to client requirements.
Our Story
Circuit Board Design was created to deliver enterprise-grade PCB design discipline with fast, disciplined delivery. Our roots go back to 2016, when we founded Electuni LLC and built a strong track record supporting hardware teams from schematic through prototype. As demand grew specifically for high-reliability PCB design, we separated this specialization into a dedicated brand—Circuit Board Design—focused entirely on layout excellence, manufacturing-first decisions, and production-ready documentation. The result is a predictable handoff, fewer iterations, and hardware that scales from prototype to production with confidence.
Core Values
Constraint-Driven Design
Every decision starts with understanding your manufacturing, cost, and performance constraints.
DFM-First Mindset
We design for the factory floor, not just the lab bench.
Clear Documentation
Release packages that make production handoff predictable and traceable.
Transparent Communication
No surprises. Regular updates, clear timelines, and honest assessments.
Why Work With Us
IPC CID & CID+ Certified
Design decisions aligned with IPC discipline and production expectations.
Manufacturing-Ready Handoff
Release packages built for fabrication/assembly: notes, outputs, and change control.
Scalable Engagement
From a single schematic to full schematic-to-PCB delivery—capacity scales to the project.
Let's Build Your Next Hardware Deliverable
Tell us what you're building. We'll respond with a clear plan, timeline, and next steps.