Terms of Service

Last updated: February 2026

1. Acceptance of Terms

By accessing circuit-board-design.com or engaging our services, you agree to be bound by these Terms of Service. These Terms apply to all visitors, users, and clients of Electuni LLC.

2. Services Provided

We provide professional electronics engineering services, including but not limited to:

  • PCB Layout and Design
  • Schematic Capture
  • BOM Optimization
  • Prototyping Consultation

3. Quotes and Payments

  • Estimates: Quotes provided are estimates based on the initial information submitted. We reserve the right to revise quotes if project scope changes (e.g., increased complexity, additional layers).
  • Payment Terms: 50% upfront, 50% upon completion is required before project commencement unless otherwise agreed in writing.

4. Intellectual Property Rights

  • Client Ownership: Upon full payment, the Client owns all rights, title, and interest in the final deliverables created specifically for the Client.
  • Our Rights: Electuni LLC retains the right to use general knowledge, skills, and code snippets/libraries developed prior to or during the project that are not specific to the Client's proprietary product (background IP).
  • Portfolio: We reserve the right to display the completed PCB design in our portfolio unless a Non-Disclosure Agreement (NDA) has been signed preventing such display.

5. Revisions and Acceptance

The Client is responsible for reviewing all designs (schematics, layouts) prior to manufacturing. We provide 2 rounds of revisions to correct errors or make minor adjustments. Major scope changes will be billed at our standard hourly rate.

6. Limitation of Liability

Electuni LLC is not liable for:

  • Manufacturing errors caused by third-party fabrication houses.
  • Design failures resulting from incorrect specifications provided by the Client.
  • Any consequential, incidental, or indirect damages arising from the use of our designs. You are responsible for final validation and testing of the prototype.

7. Governing Law

These Terms shall be governed by and defined following the laws of the United States of America. If you have questions about these Terms, please contact us at hello@circuit-board-design.com.