Custom 24 GHz Radar Module: Infineon BGT24 + STM32 Processing — PCB layout image 1
Industrial8SMT

Custom 24 GHz Radar Module: Infineon BGT24 + STM32 Processing

Custom 24GHz Radar Module | Infineon BGT24 + STM32 Processing | PCB Design & Engineering


Description

Custom-designed 24GHz radar sensor module featuring Infineon's BGT24-series radar transceiver IC with STM32 microcontroller-based signal processing. This compact circular PCB design integrates the complete RF front-end with dual SMA connectors for TX/RX antenna interfacing, I2C communication (SCL/SDA), V_tune frequency control, and on-board IF signal conditioning (IFI/IFQ).

The multi-layer board incorporates careful RF layout practices including controlled impedance traces, extensive ground stitching vias, and shielded component placement for optimal 24GHz performance. Key header breakouts provide access to GND, 5V, TX_EN, V_DAC, VCC_DIV, and EN control signals — enabling seamless integration into larger embedded systems.

Key Features

  • Radar IC: Infineon BGT24-series 24GHz radar transceiver
  • Processing: STM32 microcontroller for DSP and control
  • RF Interface: Dual SMA connectors (TX/RX)
  • Communication: I2C (SCL/SDA), analog IF outputs (IFI/IFQ)
  • Control Signals: TX_EN, EN, V_tune, V_DAC
  • Power: 5V input with on-board regulation (VCC_BGT, VCC_PTAT, VCC_DIV)
  • Form Factor: Compact circular PCB with shielded RF section
  • PCB Technology: Multi-layer, controlled impedance, dense ground via stitching

Applications

  • Industrial motion & presence detection
  • Distance measurement & ranging
  • Speed detection & traffic monitoring
  • Gesture recognition & smart home automation
  • Security & perimeter surveillance
  • IoT smart sensing systems

Designed & Engineered by Circuit-Board-Design powerd by Electuni LLC**— Custom RF, Embedded Systems & High-Frequency PCB Design

24 GHz radarInfineon BGT24MTR12STM32FMCW radarRF PCB designControlled impedanceMulti-layer RF PCBIndustrial sensor
Services used:PCB Layout

Have a similar project?

Tell us what you're building and we'll respond with a clear plan, timeline, and next steps.

Get a Free Quote

Building something like this?

Tell us what you're working on. We'll come back with scope, timeline, and a fixed quote — no call required to start.

IPC CID+ certified · 500+ PCB designs · Quote within 48 hours