Industrial Multi-Channel Power Controller Board with Fused DC/DC Outputs — PCB layout image 1
Industrial4Mixed

Industrial Multi-Channel Power Controller Board with Fused DC/DC Outputs

Industrial Multi-Channel Power Controller Board | Fused Output Distribution | DC/DC Regulated | Version 1


Description

Custom-designed industrial-grade multi-channel power controller board engineered for robust DC load management and power distribution in demanding environments. This large-format red solder mask PCB features an extensive array of fused high-current output channels (F1–F23+), dual battery input support (Batt1+, In Batt2+), and on-board DC/DC conversion — delivering reliable, protected power to dozens of downstream loads simultaneously.

The board integrates a microcontroller-based control system with a dedicated diagnostic header for real-time system monitoring, fault detection, and field debugging. Over 40+ individually addressed output connectors (FH1–FH49) provide flexible wiring to relays, solenoids, actuators, sensors, and other industrial peripherals. Multiple automotive/industrial-grade blade fuses protect each output channel against overcurrent and short-circuit faults.

Inferred Specifications

Parameter Detail
Input Voltage Dual battery input (estimated 12V–48V DC range)
Power Regulation On-board DC/DC converter module with IN GND / DC/DC F references
Output Channels 40+ fused outputs via Molex/JST-style headers (FH1–FH49)
Fuse Protection Automotive blade fuses (F11, F12, F19–F23 + additional)
Controller Microcontroller (likely STM32 or similar ARM Cortex-M, QFP package visible)
Communication Diagnostic port (likely UART/CAN), USB connector, pin headers for I2C/SPI
Switching On-board relay(s) and/or MOSFET high-side drivers for load control
Connectors High-current screw/blade terminals (X1–X4), Molex-style multi-pin headers
Board Dimensions Large form factor (~200mm × 150mm estimated)
PCB Layers Multi-layer (estimated 4-layer) with heavy copper for power planes
Solder Mask Red, industrial-grade finish
Mounting 4-corner mounting holes for DIN-rail or panel enclosure mounting
Version Version 1 (silkscreen marked)

Key Features

  • Dual Battery Input — supports redundant or load-sharing power configurations (Batt1+, In Batt2+)
  • 40+ Fused Output Channels — individually protected distribution to FH1–FH49 output headers
  • On-Board DC/DC Conversion — regulated secondary rails for logic, sensors, and low-power peripherals
  • Blade Fuse Array — field-replaceable automotive-style fuses for rapid maintenance
  • Diagnostic Interface — dedicated diagnostic header and USB port for configuration, logging, and fault readout
  • Microcontroller Intelligence — programmable load sequencing, overcurrent monitoring, and fault management
  • Heavy-Duty Connectors — high-current input/output terminals rated for industrial wiring
  • Scalable I/O Architecture — modular header layout supports application-specific wiring harnesses

Applications

  • Industrial machinery power distribution & load management
  • Vehicle / fleet electrical system controllers (trucks, agricultural, marine)
  • Building automation & HVAC power distribution panels
  • Renewable energy system load controllers
  • Telecom & server rack DC power distribution
  • Factory automation relay & actuator driver boards
  • Railway & transportation auxiliary power systems
  • Mining & heavy equipment electrical control units

Designed & Engineered by Circuit-Board-Design — Custom Industrial Electronics, Power Systems & PCB Design

Industrial power controllerMulti-channel power distributionFused outputsDC-DC converterSTM32Heavy copper PCBOvercurrent protectionIndustrial automation

Have a similar project?

Tell us what you're building and we'll respond with a clear plan, timeline, and next steps.

Get a Free Quote

Building something like this?

Tell us what you're working on. We'll come back with scope, timeline, and a fixed quote — no call required to start.

IPC CID+ certified · 500+ PCB designs · Quote within 48 hours