Core Service
Multi-Layer PCB Layout
Stackup engineering, impedance-controlled routing, and HDI microvia design from 2 to 32+ layers. Every layout is checked against your fab’s real rules before Gerbers are released.
What does PCB layout with Circuit Board Design include?
Circuit Board Design lays out boards from 2 to 32+ layers in Altium Designer or KiCad, including HDI microvias, impedance-controlled routing and high-speed interfaces such as DDR4/DDR5, PCIe and USB 3.x. Simple 2–4 layer layouts take 3–5 business days; complex HDI or high-speed boards take 7–14. PCB design starts from $1,000, and every layout includes a DFM review plus Gerber, ODB++ and IPC-2581 outputs.
What We Deliver
Multi-Layer Design
Expert design of complex multi-layer PCBs from 2 to 32+ layers, optimizing signal integrity and power distribution across all layers.
High-Speed Digital
Impedance-controlled routing, differential pair management, and length matching for DDR, PCIe, USB, and Ethernet interfaces.
HDI Technology
High Density Interconnect designs with microvias, blind/buried vias, and fine-pitch BGA fan-out for space-constrained applications.
EMC Compliance
Design strategies to minimize electromagnetic interference, proper grounding, shielding, and filtering for regulatory compliance.
Thermal Management
Thermal analysis and copper pour optimization, heat sink integration, and via stitching for effective heat dissipation.
Design for Manufacturing
Layouts optimized for efficient fabrication and assembly, reducing production costs and improving yield rates.
Our Process
Requirements Review
We analyze your schematic, component library, and mechanical constraints to establish design rules and stackup.
Stackup & Constraints
Define the layer stackup, impedance targets, and design constraints based on signal integrity and manufacturing requirements.
Component Placement
Strategic placement optimizing signal flow, thermal performance, and assembly efficiency with DFM considerations.
Routing & Verification
Complete routing with DRC/ERC verification, signal integrity simulation, and power integrity analysis.
Output Generation
Generate Gerber files, drill files, ODB++, assembly drawings, and fabrication notes for production.
Capabilities
Frequently Asked Questions
- What layer counts do you support for PCB layout?
- We support 2 to 32+ layer PCB designs. Simple boards typically use 2-4 layers; complex HDI designs with blind and buried vias can exceed 16 layers. We define the optimal stackup based on your signal integrity, power, and manufacturing requirements.
- Can you handle high-speed PCB layouts for DDR4, PCIe, and USB?
- Yes. High-speed digital layout is a core speciality. We apply impedance-controlled routing, differential pair length matching, and guard traces for DDR4/DDR5, PCIe Gen 3/4, USB 3.x, LVDS, and Gigabit Ethernet interfaces. All critical nets are verified against your SI targets.
- What EDA tools do you use for PCB layout?
- Our primary tool is Altium Designer. We also work in KiCad and can deliver native files in either format. Gerber (RS-274X), ODB++, and IPC-2581 outputs are included with every project.
- Is a DFM review included with the layout?
- Yes. Every layout delivery includes a DFM review against common fab rules (JLCPCB, PCBWay, or your nominated CM). We check trace clearances, via annular rings, soldermask slivers, acid traps, and assembly keepouts before releasing Gerbers.
Ready to start your project?
Get in touch with our team to discuss your requirements and receive a detailed quote.
Contact Us