PCB Design

What to Send a PCB Designer to Get an Accurate Quote

Circuit Board Design engineering teamNovember 24, 20269 min read
What to send for an accurate PCB quote: a quote request pack of six files, brief, schematic, BOM, outline, critical nets and deliverables, above a quote accuracy bar that runs from rough guess to fixed quote

To get an accurate PCB design quote, send six things: a one-page brief, the schematic (or a block diagram), a BOM with manufacturer part numbers, the board outline with fixed parts, your critical nets and your deliverables list. A designer prices risk. Every gap you leave gets padded or turned into a "to be confirmed" line.

Updated November 24, 2026. By the Circuit Board Design engineering team, reviewed by our IPC CID+ certified lead designer.

Animated quote request pack. Six file cards slide into a folder one by one: brief, schematic, BOM, board outline, critical nets and deliverables. A meter labelled quote accuracy climbs from rough guess to fixed quote as each card lands
Each file you add removes a guess from the quote.

Why a vague request gets a vague quote

A PCB design quote is an estimate of hours plus a margin for what the designer can't see yet. If you send "a 4-layer board with an MCU and some sensors", the designer has to guess the part count, the size, the enclosure, the interfaces and how many review rounds you'll want. Some will pad the number to cover the worst case. Others will quote low and send change requests later. Neither helps you compare offers.

Epec's layout guide puts it simply: the bare minimum most layout services want is a schematic, a bill of materials and a placement drawing. FreedomCAD's quote page lists eight items it needs before a project can start and says the more it gets at the quoting stage, the more accurate the quote. Both are linked under Sources. Our experience matches theirs. The fastest quotes we write come from packs that answer our questions before we ask them.

The quote request pack: what to send

You don't need every item on day one. The table shows why each one moves the price and what to send if you don't have it yet.

What to sendWhy it changes the quoteIf you don't have it yet
One-page briefSets scope: what the board does, where it lives, how many you'll buildWrite five lines. Function, power source, interfaces, environment, volume
Schematic (native file or PDF)Pin and net count drive layout hours more than anything elseSend a block diagram and ask for schematic design in the same quote
BOM with manufacturer part numbersPackage sizes set board area and layer count. New footprints add library workList the key parts: processor, power stage, radio, connectors
Board outline and fixed partsSize, mounting holes, connector positions and height limits decide how hard placement isA sketch with dimensions works. DXF or STEP is better
Critical netsHigh-speed buses, impedance control, RF, high current and high voltage need extra time and checksName the interfaces (USB, Ethernet, DDR, motor drive) and the designer can find the nets
Deliverables and EDA toolGerbers only is a different job from native files, fab notes, assembly drawings and a STEP modelAsk for the designer's standard handoff list and compare
Fab and assembly houseTheir capabilities set trace, space, via and stackup limits from the startSay "not chosen yet" so the designer uses common rules
Standards and compliance targetsEMC, safety spacing and IPC class change layout rules and review effortName the markets you'll sell in (US, EU, UK)
ScheduleA rush date means more hours per week and less slackGive the date you need boards in hand, not the date you need files
Who does whatSchematic, library, firmware, testing and certification can sit with you or with the designerAsk the designer to quote options separately
Checklist titled the PCB quote request pack with 10 items: one-page brief, schematic, BOM with manufacturer part numbers, board outline and fixed parts, critical nets, deliverables and EDA tool, fab and assembly house, standards and compliance targets, schedule, and who does what
Save this checklist and tick it off before you send a request.

The brief: five lines are enough

Most first emails we get skip the brief. It's the cheapest item on the list and it changes the most. A good one answers these questions in plain words:

  • What does the board do, and what does it connect to?
  • How is it powered: battery, USB, mains, a 24 V rail?
  • Where does it live: a desk, a vehicle, outdoors, a factory floor?
  • How many will you build: 5 prototypes, 500 units, 50,000 a year?
  • Is there an enclosure already, or is the board allowed to set the shape?

The BOM: part numbers, not just values

Epec makes the point well. A BOM pulled from a schematic often lists only "10k resistor" or "100 nF". The designer then has to ask if parts are through-hole or SMT, and which package. Those answers change the board area, and the area can change the layer count. A full manufacturer part number for each line ends that back-and-forth.

The outline: fix what can't move

Mark every part that has to sit in one place: connectors on the case edge, buttons, LEDs behind light pipes, the antenna, mounting holes. Add any height limit and keep-out zone. A board with free placement and one with ten fixed parts are different jobs, even with the same schematic.

What moves a PCB design quote the most

Once the scope is clear, a handful of things decide most of the hours. Knowing them helps you see where your board sits before you get a number.

Diagram of what moves a PCB design quote. Left column lowers effort: settled schematic, standard parts with existing footprints, free placement, one review round. Right column raises effort: BGAs and fine pitch, high-speed or RF interfaces, tight enclosure with many fixed parts, new footprints, rush schedule, open-ended revisions
Most of the price comes from a few drivers. Scope gaps add the rest.
  • Part and pin count. More pins mean more connections to place and route.
  • Density and packages. BGAs and fine-pitch parts need fan-out planning and often more layers.
  • High-speed, RF and power. Impedance control, length matching, antenna keep-outs and thermal paths take extra time and checking.
  • Mechanical limits. A tight enclosure with fixed connectors costs more than a free rectangle.
  • Library work. Every part without a checked footprint needs one built from the datasheet.
  • Revisions and schedule. Open-ended change rounds and rush dates both add hours.

How much does it cost to outsource PCB layout?

It depends on the drivers above, which is why a pack beats a phone call. At Circuit Board Design, PCB design starts from $1,000, and every project gets a fixed quote per board once we've seen the files. For a full breakdown of what drives cost, read our guide to how much PCB design costs.

A brief you can copy and paste

Fill this in and attach the files you have. Leave a line blank if you don't know yet. A blank line is more useful than a guess, because it tells the designer what to ask.

  • Project: name and one sentence on what it does
  • Stage: idea, breadboard, existing board to fix, existing board to redesign
  • Inputs attached: schematic (tool and version), BOM, outline (DXF or STEP), datasheets for key parts
  • Power: source, voltages, highest current
  • Interfaces: USB, Ethernet, CAN, RF, displays, motors, sensors
  • Board limits: size, layers if known, height, fixed parts, mounting holes
  • Environment and markets: temperature, vibration, moisture, US or EU or UK compliance
  • Fab and assembly: chosen house, or "not chosen yet"
  • Volume: prototypes now, units per year later
  • Deliverables: native files in Altium, KiCad or Cadence, Gerbers or ODB++, drill, pick-and-place, assembly drawing, STEP
  • Scope: schematic, layout, library, review, firmware, testing. Mark which ones you want quoted
  • Dates: when you need files, and when you need boards in hand

No schematic yet? You can still get a real quote

Plenty of projects start with a block diagram and a list of features. That's fine. Ask for schematic design and layout as two lines in the same quote. Send the block diagram, the key parts you've already chosen and any reference designs you're working from. The designer can then quote the schematic firmly and give the layout a range that tightens once the schematic is done. A fixed price for the whole job before a schematic exists usually hides a large margin.

Red flags in the quote you get back

A good pack deserves a clear quote. Before you sign, check that it answers these:

  • Does it list what's included and what isn't, such as library work, DFM checks and the design review?
  • How many revision rounds are included, and what does a change after approval cost?
  • Which files do you get at the end? Compare it with our list of PCB design deliverables.
  • Do you own the native files and the design? See who owns your PCB design files.
  • Is there a timeline tied to dates you control, like schematic sign-off?

Send an NDA before the files, if you need one

Most design firms will sign your NDA before you share a schematic. Ask for it in your first email. If you have export-controlled or defence work, say so up front as well. Epec notes that this changes how files must be handled and who can see them.

How we quote at Circuit Board Design

We've delivered 500+ PCB designs since 2016 in Altium Designer, KiCad and Cadence. Every project gets a fixed quote per board based on the files and brief you send, with what's included written out. Native files go back to you in the tool you use. You can see each stage on our process page and the full list of PCB layout services.

Already have a design drawn? Our design review has two levels. The free quick check is checklist level, with notes in 2 business days. The production-ready review is a fixed quote per board, with a report in 3 to 5 business days. If it finds nothing Critical or Major, you pay nothing.

Frequently asked questions

What do I need to send to get a PCB design quote?

Send a short brief, the schematic or a block diagram, a BOM with manufacturer part numbers, the board outline with fixed parts, your critical nets and the deliverables you expect. Add the fab house, compliance targets and dates if you know them.

Can I get a PCB design quote without a schematic?

Yes. Send a block diagram, the key parts and the features you need, and ask for schematic design and layout as separate lines. The schematic can be quoted firmly and the layout tightened once the schematic is done.

Why do PCB design quotes vary so much?

Each designer fills the gaps in your request with their own assumptions about part count, layers, enclosure limits and revisions. Some pad for risk and some quote low and add change orders later. A complete request pack makes quotes comparable.

How much does it cost to outsource PCB layout?

It depends mainly on pin count, density, high-speed or RF content, mechanical limits, library work and schedule. At Circuit Board Design, PCB design starts from $1,000, with a fixed quote per board after we see your files.

Should I sign an NDA before sending my schematic?

If the design is sensitive, yes. Most design firms will sign one before you share files. Ask for it in your first message, and mention any export control or defence requirements at the same time.

Which file formats should I send for a quote?

Native EDA files are best, a PDF schematic is fine. For the BOM, a spreadsheet with manufacturer part numbers. For the outline, DXF or STEP, or a dimensioned sketch if you have nothing else.

Get a quote that holds

Send us what you have, even if the pack is half full. We'll tell you what's missing before we price it. If you already have a layout, start with the free quick check and get checklist-level notes in 2 business days. Then you get a fixed quote before any work starts.

Send your board for a free quick check

Starting a new design? Send your brief through our contact page or see all PCB design services.

Sources

Share:
Back to all posts

Free quick check

Free quick check of your board: notes in 2 business days. Then a fixed quote.

Send a link to your schematic and layout. An IPC CID+ certified designer checks it against the faults that most often cost a respin, and you get written notes. No obligation.

You Might Also Like